Knoxville Solar (PJM-AD2-085) — Project Summary

Queue ID
PJM-AD2-085
Capacity
51 MW
Technology
Solar
Status
active
Location
Isle Of Wight, VA
Region
PJM
Developer
IA Status
IA Executed

Knoxville Solar

PJM-AD2-085BetaActiveSolarPJMLBNL + Live

51 MW generation in Isle Of Wight, VA · In queue since March 2018 · Proposed COD December 2027

51 MW

Capacity

1

Components

Solar

8y 2m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

9y 9m

Construction75%
Queue EntryMar 21, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-01

About

Knoxville Solar is a proposed 51 MW solar generation project located in Isle Of Wight County, Virginia. The project is in the PJM interconnection queue as entry AD2-085, with a queue entry date of March 21, 2018. Dominion is the interconnecting utility. The proposed commercial operation date is December 1, 2027, and the project has an executed Interconnection Agreement (IA).

The Knoxville Solar project is listed as active in the PJM queue. It is interconnected at the Myrtle-Windsor DP 115kV point of interconnection. The project has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Isle Of Wight

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Myrtle-Windsor DP 115kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Knoxville Solar