Broomstick Solar Energy Centergy Center (PJM-AD2-100) — Project Summary

Queue ID
PJM-AD2-100
Capacity
210 MW
Technology
Solar
Status
suspended
Location
Christian, IL
Region
PJM
Developer
IA Status
IA Executed

Broomstick Solar Energy Centergy Center

PJM-AD2-100BetaSuspendedSolarPJMLBNL + Live

210 MW generation in Christian, IL · In queue since March 2018 · Proposed COD December 2028

210 MW

Capacity

1

Components

Solar

8y 2m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

10y 9m

Suspended75%
Queue EntryMar 23, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-12-07

About

The Broomstick Solar Energy Centergy Center is a proposed 210 MW solar generation project located in Christian County, Illinois. The project is in the PJM interconnection queue as entry PJM-AD2-100, with a queue entry date of March 23, 2018. The proposed commercial operation date is December 7, 2028, and the interconnection agreement has been executed.

The project is currently listed as suspended in the interconnection queue. It is to be interconnected to the ComEd utility system at the Kincaid-Pana 345 kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Christian

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Kincaid-Pana 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Broomstick Solar Energy Centergy Center