Broomstick Solar Energy Centergy Center
50 MW generation in Christian, IL · In queue since March 2018 · Proposed COD December 2028
50 MW
Capacity
1
Components
Solar
8y 2m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
10y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2028-12-07
The Broomstick Solar Energy Centergy Center is a proposed 50 MW solar generation project located in Christian County, Illinois. The project is being developed within the PJM Interconnection queue as entry PJM-AD2-131, with an original queue entry date of March 24, 2018. The proposed commercial operation date is December 7, 2028.
The Broomstick Solar Energy Centergy Center has an Interconnection Agreement (IA) listed as Executed. The point of interconnection is the Kincaid-Pana 345kV line. The project's status is currently listed as suspended.
Generated from interconnection queue and public data sources
State
IL
County
Christian
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Kincaid-Pana 345kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.