Shady Oaks Wind Power Project
105.9 MW generation in Lee, IL · In queue since January 1970 · Proposed COD December 2027
105.9 MW
Capacity
1
Components
Wind
56y 4m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
57y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2027-12-07
The Shady Oaks Wind Power Project is a proposed wind generation project with a total capacity of 105.9 MW, located in Lee County, Illinois. The project is interconnected to the ComEd utility within the PJM Interconnection queue as project PJM-AD2-134, with a queue entry date of January 1, 1970. The proposed commercial operation date is December 7, 2027, and the Interconnection Agreement (IA) has been executed.
The project is linked to the existing Shady Oaks Wind 2 operating plant (EIA ID 66568). The Shady Oaks Wind Power Project has been the subject of recent news coverage, with articles categorized as regulatory and industry news.
Generated from interconnection queue and public data sources
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Shady Oaks
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 100 SHAD34.5 KV GSG6WF
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.