Shady Oaks Wind Power Project (PJM-AD2-134) — Project Summary

Queue ID
PJM-AD2-134
Capacity
105.9 MW
Technology
Wind
Status
active
Location
Lee, IL
Region
PJM
Developer
IA Status
IA Executed

Shady Oaks Wind Power Project

PJM-AD2-134BetaActiveWindPJMLBNL + Live

105.9 MW generation in Lee, IL · In queue since January 1970 · Proposed COD December 2027

105.9 MW

Capacity

1

Components

Wind

56y 4m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

57y 11m

Construction75%
Queue EntryJan 1, 1970

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-12-07

About

The Shady Oaks Wind Power Project is a proposed wind generation project with a total capacity of 105.9 MW, located in Lee County, Illinois. The project is interconnected to the ComEd utility within the PJM Interconnection queue as project PJM-AD2-134, with a queue entry date of January 1, 1970. The proposed commercial operation date is December 7, 2027, and the Interconnection Agreement (IA) has been executed.

The project is linked to the existing Shady Oaks Wind 2 operating plant (EIA ID 66568). The Shady Oaks Wind Power Project has been the subject of recent news coverage, with articles categorized as regulatory and industry news.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Lee

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Shady Oaks

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
100 SHAD34.5 KV GSG6WF

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Shady Oaks Wind Power Project