Monroe-Sicklerville Road LF Solar (PJM-AD2-135) — Project Summary

Queue ID
PJM-AD2-135
Capacity
1.62 MW
Technology
Solar
Status
active
Location
Gloucester, NJ
Region
PJM
Developer
IA Status
Facility Study

Monroe-Sicklerville Road LF Solar

PJM-AD2-135BetaActiveSolarPJMLBNL + Live

1.62 MW generation in Gloucester, NJ · In queue since March 2018 · Proposed COD March 2025

1.62 MW

Capacity

1

Components

Solar

8y 2m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

7 years

Schedule

14 months past proposed COD

Facilities Study50%
Queue EntryMar 23, 2018

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

The Monroe-Sicklerville Road LF Solar project is a proposed 1.62 MW solar generation project located in Gloucester County, New Jersey. The project is in the PJM interconnection queue as entry AD2-135, with a queue entry date of March 23, 2018. The proposed commercial operation date is March 1, 2025.

The project's interconnection status is currently in the Facility Study phase. The designated point of interconnection (POI) is Williamstown 12kV. The Area Electric Cooperative (AEC) is listed as the utility. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Gloucester

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEC

Entity

PJM

Service Type

Point of Interconnection

Williamstown 12kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
WILLIAMS69 KV T4
POI Substation
Williamstown Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Monroe-Sicklerville Road LF Solar