Winterpock I
20 MW generation in Chesterfield, VA · In queue since August 2018 · Proposed COD February 2025
20 MW
Capacity
1
Components
Solar
7y 9m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
6y 6m
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-02-04
The Winterpock I project is a proposed 20 MW solar generation project located in Chesterfield County, Virginia. The project is in the PJM interconnection queue as entry AE1-074, with a queue entry date of August 1, 2018. Dominion is the interconnecting utility.
The proposed commercial operation date for Winterpock I is February 4, 2025. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Winterpock 34.5 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Winterpock 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Winterpock I