PJM-AE1-092
206.6 MW generation in Union, OH · In queue since August 2018 · Proposed COD December 2021
206.6 MW
Capacity
1
Components
Solar
7y 9m
In Queue
System Impact Study
IA Status
COD target: 2021
Total Duration
3y 4m
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-31
PJM-AE1-092 is a proposed solar generation project with a total capacity of 206.6 MW. The project is located in Union County, Ohio, and interconnects to the PJM grid at the Blue Jacket-Kirby 138 kV point of interconnection. The project entered the PJM interconnection queue on August 31, 2018, with a proposed commercial operation date of December 31, 2021. Its interconnection status is currently in the System Impact Study phase.
The Dayton utility is associated with the project. The proposed project consists solely of solar generation, with no battery storage or other generation types included in the listed components.
Generated from interconnection queue and public data sources
State
OH
County
Union
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dayton
Entity
PJM
Service Type
—
Point of Interconnection
Blue Jacket-Kirby 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM