Vinton Energy Storage (PJM-AE1-093) — Project Summary

Queue ID
PJM-AE1-093
Capacity
42 MW
Technology
Battery
Status
suspended
Location
Vinton, OH
Region
PJM
Developer
IA Status
IA Executed

Vinton Energy Storage

PJM-AE1-093BetaSuspendedBatteryPJMLBNL + Live

42 MW storage in Vinton, OH · In queue since August 2018 · Proposed COD December 2026

42 MW

Capacity

1

Components

Battery

7y 9m

In Queue

IA Executed

IA Status

COD target: 2026

Interconnection

Total Duration

8y 4m

Suspended75%
Queue EntryAug 31, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-12-31

About

The Vinton Energy Storage project is a proposed 42 MW battery energy storage system in Vinton County, Ohio. The project is located within the PJM Interconnection region and is being interconnected to the AEP utility grid at the Elk 138 kV point of interconnection.

The project, identified as queue ID PJM-AE1-093, entered the PJM interconnection queue on August 31, 2018, and has a proposed commercial operation date of December 31, 2026. The project's interconnection agreement has been executed, but its status is currently listed as suspended. The development project consists of 42 MW of battery storage capacity.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Vinton

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Elk 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
ELKGARD2138 KV T1
POI Substation
Elk Garden Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Vinton Energy Storage