Blue Creek Wind Farm
26 MW generation in Van Wert, OH · In queue since September 2018 · Proposed COD November 2024
26 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2024
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2024-11-30
The proposed Blue Creek Wind Farm is a 26 MW solar generation project located in Van Wert County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-102, with a queue entry date of September 1, 2018. The proposed commercial operation date is November 30, 2024.
The interconnection agreement for the Blue Creek Wind Farm has been executed. The designated point of interconnection is the Maddox Creek 345 kV substation, and the interconnecting utility is AEP. The project's current status within the PJM queue is listed as suspended.
Generated from interconnection queue and public data sources
State
OH
County
Van Wert
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Maddox Creek 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BLUECREE34.5 KV BLUEC1WF
- POI Substation
- Maddox Creek Substation