Blue Creek Wind Farm (PJM-AE1-102) — Project Summary

Queue ID
PJM-AE1-102
Capacity
26 MW
Technology
Solar
Status
suspended
Location
Van Wert, OH
Region
PJM
Developer
IA Status
IA Executed

Blue Creek Wind Farm

PJM-AE1-102BetaSuspendedSolarPJMLBNL + Live

26 MW generation in Van Wert, OH · In queue since September 2018 · Proposed COD November 2024

26 MW

Capacity

1

Components

Solar

7y 8m

In Queue

IA Executed

IA Status

COD target: 2024

Interconnection

Total Duration

6y 2m

Suspended75%
Queue EntrySep 1, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2024-11-30

About

The proposed Blue Creek Wind Farm is a 26 MW solar generation project located in Van Wert County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-102, with a queue entry date of September 1, 2018. The proposed commercial operation date is November 30, 2024.

The interconnection agreement for the Blue Creek Wind Farm has been executed. The designated point of interconnection is the Maddox Creek 345 kV substation, and the interconnecting utility is AEP. The project's current status within the PJM queue is listed as suspended.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Van Wert

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Maddox Creek 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BLUECREE34.5 KV BLUEC1WF
POI Substation
Maddox Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.