Ho-Fel Solar
40 MW generation in Isle Of Wight, VA · In queue since September 2018 · Proposed COD October 2026
40 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
8y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2026-10-19
The Ho-Fel Solar project is a proposed 40 MW solar generation project located in Isle Of Wight County, Virginia. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-103, with a queue entry date of September 1, 2018, and a proposed commercial operation date of October 19, 2026. The interconnection agreement (IA) for the project has been executed, but the project status is currently listed as suspended.
The proposed project is linked to the existing Ho-Fel Solar operating plant (EIA ID 68970). Dominion is listed as the utility.
Generated from interconnection queue and public data sources
State
VA
County
Isle Of Wight
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Holland-Union Camp 115 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- 1075455179
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.