Brandonville Solar
99.6 MW generation in Preston, WV · In queue since September 2018 · Proposed COD December 2026
99.6 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2026-12-31
Brandonville Solar is a proposed 99.6 MW solar generation project located in Preston County, West Virginia. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-106, with a queue entry date of September 11, 2018. The proposed commercial operation date is December 31, 2026, and the Interconnection Agreement (IA) has been executed.
The project, which is currently listed as "suspended", is being developed within the service territory of APS. Brandonville Solar has been the subject of recent news coverage, with five articles categorized as regulatory matters.
Generated from interconnection queue and public data sources
State
WV
County
Preston
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Lake Lynn-Hazelton 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26