Riverstone Solar
149.5 MW generation in Buckingham, VA · In queue since September 2018 · Proposed COD November 2027
149.5 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
9y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-11-30
Riverstone Solar is a proposed solar generation project with a total capacity of 149.5 MW, located in Buckingham County, Virginia. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-108, with a queue entry date of September 13, 2018, and a proposed commercial operation date of November 30, 2027. The interconnection agreement (IA) for the project has been executed.
The proposed project is linked to the existing Riverstone Solar operating plant. Riverstone Solar has been featured in recent news coverage.
Generated from interconnection queue and public data sources
State
VA
County
Buckingham
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Bremo-Scottsville 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26