PJM-AE1-114
150 MW generation in Ogle, IL · In queue since September 2018 · Proposed COD December 2021
150 MW
Capacity
1
Components
Wind
7y 8m
In Queue
System Impact Study
IA Status
COD target: 2021
Total Duration
3y 3m
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-31
PJM-AE1-114 is a proposed 150 MW wind generation project located in Ogle County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 13, 2018. The proposed commercial operation date is December 31, 2021.
The interconnection status of the project is currently in the System Impact Study phase. The point of interconnection (POI) is the Maryland-Lancaster 138 kV line. The utility is ComEd, and the entity is PJM.
Generated from interconnection queue and public data sources
State
IL
County
Ogle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Maryland-Lancaster 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AE1-114