Project PJM-AE1-148 — Project Summary

Queue ID
PJM-AE1-148
Capacity
90 MW
Technology
Solar
Status
active
Location
Mecklenburg, VA
Region
PJM
Developer
IA Status
System Impact Study

PJM-AE1-148

PJM-AE1-148BetaActiveSolarPJMLBNL

90 MW generation in Mecklenburg, VA · In queue since September 2018 · Proposed COD December 2021

90 MW

Capacity

1

Components

Solar

7y 8m

In Queue

System Impact Study

IA Status

COD target: 2021

Interconnection

Total Duration

3y 3m

Schedule

54 months past proposed COD

Impact Study25%
Queue EntrySep 24, 2018

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-12-01

About

PJM-AE1-148 is a proposed 90 MW solar generation project located in Mecklenburg County, Virginia. The project is in the PJM interconnection queue, having entered on September 24, 2018, with a proposed commercial operation date of December 1, 2021. Dominion is the interconnecting utility.

The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Kerr Dam-Ridge Rd 115 kV line.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Mecklenburg

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Kerr Dam-Ridge Rd 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AE1-148