PJM-AE1-148
90 MW generation in Mecklenburg, VA · In queue since September 2018 · Proposed COD December 2021
90 MW
Capacity
1
Components
Solar
7y 8m
In Queue
System Impact Study
IA Status
COD target: 2021
Total Duration
3y 3m
Schedule
54 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-01
PJM-AE1-148 is a proposed 90 MW solar generation project located in Mecklenburg County, Virginia. The project is in the PJM interconnection queue, having entered on September 24, 2018, with a proposed commercial operation date of December 1, 2021. Dominion is the interconnecting utility.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Kerr Dam-Ridge Rd 115 kV line.
Generated from interconnection queue and public data sources
State
VA
County
Mecklenburg
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Kerr Dam-Ridge Rd 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AE1-148