Wingstem Solar Energy Farm
150 MW generation in Cass, MI · In queue since September 2018 · Proposed COD December 2025
150 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2025-12-31
The Wingstem Solar Energy Farm is a proposed 150 MW solar generation project located in Cass County, Michigan. The project is being developed within the PJM Interconnection queue as entry PJM-AE1-170, with a queue entry date of September 25, 2018. The proposed commercial operation date is December 31, 2025.
The project's interconnection agreement (IA) has been executed. The designated point of interconnection (POI) is the Kenzie Creek-Colby 138 kV line. The project is currently listed as having suspended status within the PJM queue.
Generated from interconnection queue and public data sources
State
MI
County
Cass
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Kenzie Creek-Colby 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Wingstem Solar Energy Farm