Blooming Grove Solar Energy Center
200 MW generation in Livingston, IL · In queue since September 2018 · Proposed COD December 2028
200 MW
Capacity
1
Components
Solar
7y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-29
The Blooming Grove Solar Energy Center is a proposed 200 MW solar generation project located in Livingston County, Illinois. The project is in the PJM interconnection queue as entry PJM-AE1-205, with a queue entry date of September 26, 2018, and a proposed commercial operation date of December 29, 2028. Its interconnection status is currently in the Facility Study phase.
The project, which interconnects with ComEd at the McLean 345 kV point of interconnection, has been featured in recent news coverage.
Generated from interconnection queue and public data sources
State
IL
County
Livingston
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
McLean 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- TYSONS 230 KV SR1
- POI Substation
- TPSS#3 - McLean
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Blooming Grove Solar Energy Center