Raleigh Solar Project
90 MW generation in Raleigh, WV · In queue since September 2018 · Proposed COD June 2025
90 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2025-06-25
The proposed Raleigh Solar Project is a 90 MW solar generation project located in Raleigh County, West Virginia. The project is interconnected to the PJM Interconnection queue under queue ID PJM-AE1-212. Its queue entry date was September 10, 2018, and the proposed commercial operation date is June 25, 2025. The project's interconnection agreement has been executed, but its current status is listed as suspended.
The project is being developed within the American Electric Power (AEP) service territory. The point of interconnection is the Grandview-Clifftop 138 kV line. The Raleigh Solar Project has appeared in recent news coverage regarding renewable energy development in the region.
Generated from interconnection queue and public data sources
State
WV
County
Raleigh
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Grandview-Clifftop 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.