Recreation Solar
49.5 MW generation in Guernsey, OH · In queue since September 2018 · Proposed COD December 2025
49.5 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2025-12-15
The Recreation Solar project is a proposed 49.5 MW solar generation facility located in Guernsey County, Ohio. The project is in the PJM interconnection queue as entry PJM-AE1-227, with a queue entry date of September 28, 2018. The proposed commercial operation date is December 15, 2025. The interconnecting utility is AEP.
The project's interconnection agreement has been executed. As of the latest data, the project's status is listed as suspended. The point of interconnection is the South Cumberland 69 kV substation. The developer is not specified in the available data.
Generated from interconnection queue and public data sources
State
OH
County
Guernsey
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
South Cumberland 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.