Pilesgrove Solar Project
149.3 MW generation in Salem, NJ · In queue since September 2018 · Proposed COD December 2027
149.3 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
9y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2027-12-31
The Pilesgrove Solar Project is a proposed solar generation project located in Salem County, New Jersey, with a total capacity of 149.3 MW. The project is listed in the PJM interconnection queue as entry AE1-229, with a queue entry date of September 18, 2018. The proposed commercial operation date is December 31, 2027. The interconnection agreement has been executed, but the project is currently listed as suspended.
The project, which is being developed within the PJM region, consists solely of solar photovoltaic generation. The designated point of interconnection is the Deepwater-Upper Pittsgrove 138 kV line.
Generated from interconnection queue and public data sources
State
NJ
County
Salem
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEC
Entity
PJM
Service Type
—
Point of Interconnection
Deepwater-Upper Pittsgrove 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.