Pilesgrove Solar Project (PJM-AE1-229) — Project Summary

Queue ID
PJM-AE1-229
Capacity
149.3 MW
Technology
Solar
Status
suspended
Location
Salem, NJ
Region
PJM
Developer
IA Status
IA Executed

Pilesgrove Solar Project

PJM-AE1-229BetaSuspendedSolarPJMLBNL + Live

149.3 MW generation in Salem, NJ · In queue since September 2018 · Proposed COD December 2027

149.3 MW

Capacity

1

Components

Solar

7y 8m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

9y 3m

Suspended75%
Queue EntrySep 18, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

About

The Pilesgrove Solar Project is a proposed solar generation project located in Salem County, New Jersey, with a total capacity of 149.3 MW. The project is listed in the PJM interconnection queue as entry AE1-229, with a queue entry date of September 18, 2018. The proposed commercial operation date is December 31, 2027. The interconnection agreement has been executed, but the project is currently listed as suspended.

The project, which is being developed within the PJM region, consists solely of solar photovoltaic generation. The designated point of interconnection is the Deepwater-Upper Pittsgrove 138 kV line.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Salem

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEC

Entity

PJM

Service Type

Point of Interconnection

Deepwater-Upper Pittsgrove 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.