Enclave Solar Energy Center (PJM-AE2-033) — Project Summary

Queue ID
PJM-AE2-033
Capacity
149 MW
Technology
Solar
Status
suspended
Location
Sussex, VA
Region
PJM
Developer
IA Status
IA Executed

Enclave Solar Energy Center

PJM-AE2-033BetaSuspendedSolarPJMLBNL + Live

149 MW generation in Sussex, VA · In queue since January 2019 · Proposed COD February 2027

149 MW

Capacity

1

Components

Solar

7y 4m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

8y 1m

Suspended75%
Queue EntryJan 8, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-02-04

About

The Enclave Solar Energy Center is a proposed 149 MW solar generation project located in Sussex County, Virginia. The project is being developed within the Dominion service area and has interconnection queue ID PJM-AE2-033 in the PJM Interconnection queue. The project entered the queue on January 8, 2019, with a proposed commercial operation date of February 4, 2027. The interconnection agreement (IA) for the project has been executed, and the project's status is currently listed as suspended.

The proposed project consists of 149 MW of solar photovoltaic generation. The point of interconnection (POI) is the Clubhouse-Sapony 230 kV line. The Enclave Solar Energy Center has appeared in recent news coverage regarding renewable energy development in the region.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Sussex

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Clubhouse-Sapony 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Enclave Solar Energy Center