Albemarle Beach Solar
60 MW generation in Washington, NC · In queue since January 1970 · Proposed COD December 2026
60 MW
Capacity
1
Components
Solar
56y 4m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
56y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-12-31
The Albemarle Beach Solar project is a proposed 60 MW solar generation project located in Washington County, North Carolina. The project is in the PJM interconnection queue as entry PJM-AE2-034, with a queue entry date of January 1, 1970. Dominion is the interconnecting utility. The proposed commercial operation date is December 31, 2026, and the project has an Interconnection Agreement (IA) executed.
The project, under development in the PJM region, consists of 60 MW of solar capacity. The point of interconnection (POI) is the Mackeys 230 kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
NC
County
Washington
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Mackeys 230 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MACKEYS 34.5 KV MACKEYSP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Albemarle Beach Solar