Potter Solar
35 MW generation in Potter, PA · In queue since February 2019 · Proposed COD July 2026
35 MW
Capacity
1
Components
Solar
7y 3m
In Queue
System Impact Study
IA Status
COD target: 2026
Total Duration
7y 5m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-07-31
Potter Solar is a proposed 35 MW solar generation project located in Potter County, Pennsylvania. The project is interconnected within the PJM Interconnection queue as entry AE2-074, with a queue entry date of February 20, 2019. The proposed commercial operation date is July 31, 2026. The project's interconnection status is currently in the System Impact Study phase.
The development is linked to an existing operating plant named Potter Solar (EIA plant ID 67876). The confidence level of the match between the queue project and the existing plant is 85%. The designated point of interconnection (POI) is the Potter 46 kV substation.
Generated from interconnection queue and public data sources
State
PA
County
Potter
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Potter 46 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- APS
- POI Substation
- Potter Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.