Rocky Ford Solar Energy Center
90 MW generation in Henry, VA · In queue since March 2019 · Proposed COD December 2026
90 MW
Capacity
1
Components
Solar
7y 2m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
7y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2026-12-31
The Rocky Ford Solar Energy Center is a proposed 90 MW solar generation project located in Henry County, Virginia. The project, developed by AEP, is interconnected within the PJM Interconnection queue as entry AE2-166, filed on March 16, 2019. The proposed commercial operation date is December 31, 2026, and the interconnection agreement has been executed. The point of interconnection is the Stockton 138 kV line.
The Rocky Ford Solar Energy Center development has been the subject of recent news coverage, with eight articles appearing in industry publications. The project's status is currently listed as suspended.
Generated from interconnection queue and public data sources
State
VA
County
Henry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Stockton 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- STOCKTON69 KV LOADT2
- POI Substation
- Stockton Substation