Golden Aster Solar Energy Center (PJM-AE2-172) — Project Summary

Queue ID
PJM-AE2-172
Capacity
40 MW
Technology
Battery
Status
suspended
Location
Grant, IN
Region
PJM
Developer
IA Status
IA Executed

Golden Aster Solar Energy Center

PJM-AE2-172BetaSuspendedBatteryPJMLBNL + Live

40 MW storage in Grant, IN · In queue since March 2019 · Proposed COD May 2026

40 MW

Capacity

1

Components

Battery

7y 2m

In Queue

IA Executed

IA Status

COD target: 2026

Interconnection

Total Duration

7y 2m

Suspended75%
Queue EntryMar 16, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-05-31

About

The Golden Aster Solar Energy Center is a proposed 40 MW battery storage project located in Grant County, Indiana. The project is interconnected within the PJM Interconnection queue as entry PJM-AE2-172, with an original queue entry date of March 16, 2019. The proposed commercial operation date is May 31, 2026.

The project, being developed near the Mississinewa-Gaston 138 kV point of interconnection, has an Interconnection Agreement (IA) that has been executed. The utility is AEP. The project's status is currently listed as suspended.

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Grant

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Mississinewa-Gaston 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Golden Aster Solar Energy Center