Gladys II Solar Farm (PJM-AE2-185) — Project Summary

Queue ID
PJM-AE2-185
Capacity
60 MW
Technology
Solar
Status
active
Location
Campbell, VA
Region
PJM
Developer
IA Status
System Impact Study

Gladys II Solar Farm

PJM-AE2-185BetaActiveSolarPJMLBNL

60 MW generation in Campbell, VA · In queue since March 2019 · Proposed COD September 2020

60 MW

Capacity

1

Components

Solar

7y 2m

In Queue

System Impact Study

IA Status

COD target: 2020

Interconnection

Total Duration

1y 6m

Schedule

69 months past proposed COD

Impact Study25%
Queue EntryMar 18, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2020-09-01

About

The Gladys II Solar Farm is a proposed 60 MW solar generation project in Campbell County, Virginia. The project, developed under the utility Dominion, is listed in the PJM interconnection queue as entry AE2-185, with a queue entry date of March 18, 2019. The proposed commercial operation date is September 1, 2020. As of the current interconnection status, the project is in the System Impact Study phase.

The proposed project is linked to the existing Gladys Solar LLC operating plant (EIA plant ID 67871). The point of interconnection is the Gladys DP-Stonemill Switching Station at 69 kV. The Gladys II Solar Farm project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Campbell

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Gladys DP-Stonemill Switching Station 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
DOM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Gladys II Solar Farm