Harrowgate 1
20 MW generation in Chesterfield, VA · In queue since March 2019 · Proposed COD June 2027
20 MW
Capacity
1
Components
Solar
7y 2m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-30
The Harrowgate 1 project is a proposed 20 MW solar generation project located in Chesterfield County, Virginia. The project is being developed within the Dominion service area and has entered the PJM interconnection queue as queue ID PJM-AE2-212 on March 20, 2019.
The proposed commercial operation date for Harrowgate 1 is June 30, 2027. As of the latest data, the project's interconnection status is in the System Impact Study phase. The point of interconnection is the Harrowgate 34 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Harrowgate 34 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- HARWGATE13 KV TX1
- POI Substation
- Harrowgate Substation