Sloopy Solar Energy Center (PJM-AE2-217) — Project Summary

Queue ID
PJM-AE2-217
Capacity
180 MW
Technology
Solar
Status
active
Location
Clark, OH
Region
PJM
Developer
IA Status
IA Executed

Sloopy Solar Energy Center

PJM-AE2-217BetaActiveSolarPJMLBNL + Live

180 MW generation in Clark, OH · In queue since March 2019 · Proposed COD September 2028

180 MW

Capacity

1

Components

Solar

7y 2m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

9y 6m

Construction75%
Queue EntryMar 21, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-09-30

About

The Sloopy Solar Energy Center is a proposed 180 MW solar generation project located in Clark County, Ohio. The project is in the PJM interconnection queue as entry PJM-AE2-217, with a queue entry date of March 21, 2019, and a proposed commercial operation date of September 30, 2028. The interconnection agreement (IA) has been executed.

The project is interconnected to the ATSI utility system at the East Springfield-London 138 kV point of interconnection. The Sloopy Solar Energy Center has been the subject of recent news coverage, with three articles categorized as industry and regulatory news.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Clark

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

East Springfield-London 138 kV

Data Source

LBNL + Live

ApplicantInvenergySpringfield News-Sun · 2025-10-09
AgencyOhio Power Siting BoardSpringfield News-Sun · 2025-10-09
RulingNoticeSpringfield News-Sun · 2025-10-09
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about Sloopy Solar Energy Center