PJM-AE2-223
150 MW generation in Mclean, IL · In queue since March 2019 · Proposed COD October 2022
150 MW
Capacity
1
Components
Wind
7y 2m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
3y 7m
Schedule
43 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-10-31
PJM-AE2-223 is a proposed 150 MW wind generation project located in McLean County, Illinois. The project is interconnected within the PJM Interconnection queue, with an entry date of March 22, 2019. The proposed commercial operation date is October 31, 2022.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the McLean 345 kV substation. The proposed project is within the ComEd utility territory.
Generated from interconnection queue and public data sources
State
IL
County
Mclean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
McLean 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- TYSONS 230 KV SR1
- POI Substation
- TPSS#3 - McLean
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.