PJM-AE2-289
80 MW generation in Allegany, MD · In queue since March 2019 · Proposed COD December 2021
80 MW
Capacity
1
Components
Wind
7y 2m
In Queue
Facility Study
IA Status
COD target: 2021
Total Duration
2y 9m
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-31
PJM-AE2-289 is a proposed 80 MW wind generation project located in Allegany County, Maryland. The project is interconnected within the PJM Interconnection queue, with an entry date of March 29, 2019. The proposed commercial operation date is December 31, 2021.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Frostburg 138 kV substation, and the utility is APS.
Generated from interconnection queue and public data sources
State
MD
County
Allegany
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Frostburg 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CARLOJCT34.5 KV JADEMDHB
- POI Substation
- Frostburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.