Clermont County Solar Project
100 MW generation in Clermont, OH · In queue since March 2019 · Proposed COD December 2025
100 MW
Capacity
1
Components
Solar
7y 2m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2025-12-31
The Clermont County Solar Project is a proposed 100 MW solar generation project located in Clermont County, Ohio. The project is in the PJM interconnection queue as entry PJM-AE2-318, with a queue entry date of March 31, 2019. The proposed commercial operation date is December 31, 2025.
The project's interconnection agreement has been executed. The designated point of interconnection is the Ford-Cedarville 138 kV line. The project is currently listed as suspended in the interconnection queue.
Generated from interconnection queue and public data sources
State
OH
County
Clermont
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DEOK
Entity
PJM
Service Type
—
Point of Interconnection
Ford-Cedarville 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Clermont County Solar Project