PJM-AE2-321
100 MW generation in Mchenry, IL · In queue since March 2019 · Proposed COD December 2021
100 MW
Capacity
1
Components
Solar
7y 2m
In Queue
System Impact Study
IA Status
COD target: 2021
Total Duration
2y 9m
Schedule
54 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-01
The proposed project PJM-AE2-321 is a 100 MW solar generation project located in McHenry County, Illinois. Interconnecting to the ComEd utility via the Belvidere-Marengo 138 kV point of interconnection, the project entered the PJM interconnection queue on March 30, 2019, with a proposed commercial operation date of December 1, 2021. The project's interconnection status is currently in the System Impact Study phase.
The development project consists of 100 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM queue.
Generated from interconnection queue and public data sources
State
IL
County
Mchenry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Belvidere-Marengo 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AE2-321