Wythe County Solar Project (PJM-AE2-326) — Project Summary

Queue ID
PJM-AE2-326
Capacity
52.2 MW
Technology
Battery
Status
active
Location
Wythe, VA
Region
PJM
Developer
IA Status
Facility Study

Wythe County Solar Project

PJM-AE2-326BetaActiveBatteryPJMLBNL + Live

52.2 MW storage in Wythe, VA · In queue since March 2019 · Proposed COD June 2027

52.2 MW

Capacity

1

Components

Battery

7y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

8y 3m

Facilities Study50%
Queue EntryMar 30, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-15

About

The Wythe County Solar Project is a proposed 52.2 MW battery storage project located in Wythe County, Virginia. The project is in the PJM interconnection queue as entry AE2-326, with a queue entry date of March 30, 2019, and a proposed commercial operation date of June 15, 2027. The project's interconnection status is currently in the Facility Study phase.

The project is being developed within the AEP utility territory. Recent news coverage indicates interest in the project, with six articles appearing in the news, covering regulatory, deal-making, and industry aspects.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Wythe

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Jacksons Ferry 138 kV

Data Source

LBNL + Live

DeveloperSavionSolar Power World · 2020-11-23
TransactionPPASolar Power World · 2020-11-23
Deal value$133.0MSolar Power World · 2020-11-23
OfftakerDominion Energy VirginiaSolar Power World · 2020-11-23
PPA structurePhysicalSolar Power World · 2020-11-23
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
JACKSONS34.5 KV WYTHECSP
POI Substation
Jacksons Ferry Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26