Waller Solar I (PJM-AF1-042) — Project Summary

Queue ID
PJM-AF1-042
Capacity
45 MW
Technology
Solar
Status
active
Location
Lancaster, VA
Region
PJM
Developer
IA Status
IA Executed

Waller Solar I

PJM-AF1-042BetaActiveSolarPJMLBNL + Live

45 MW generation in Lancaster, VA · In queue since June 2019 · Proposed COD December 2027

45 MW

Capacity

1

Components

Solar

6y 11m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

8y 6m

Construction75%
Queue EntryJun 24, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

About

The Waller Solar I project is a proposed 45 MW solar generation project located in Lancaster County, Virginia. The project is in the PJM interconnection queue as entry PJM-AF1-042, with a queue entry date of June 24, 2019. The proposed commercial operation date is December 31, 2027. The project's interconnection agreement has been executed.

The proposed project is being developed within Dominion's service territory. The point of interconnection is the Garner DP-Lancaster 115 kV substation. The project is listed as active in the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Lancaster

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Garner DP-Lancaster 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.