Project PJM-AF1-116 — Project Summary

Queue ID
PJM-AF1-116
Capacity
120 MW
Technology
Solar
Status
active
Location
Washington, KY
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-116

PJM-AF1-116BetaActiveSolarPJMLBNL

120 MW generation in Washington, KY · In queue since September 2019 · Proposed COD December 2023

120 MW

Capacity

1

Components

Solar

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2023

Interconnection

Total Duration

4y 3m

Schedule

29 months past proposed COD

Impact Study25%
Queue EntrySep 12, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-29

About

PJM-AF1-116 is a proposed solar generation project located in Washington County, Kentucky, within the PJM Interconnection region. The project, with a total capacity of 120 MW, is being developed in the East Kentucky Power Cooperative (EKPC) service area. It consists of 120 MW of solar photovoltaic generation.

The project entered the PJM interconnection queue on September 12, 2019, and has a proposed commercial operation date of December 29, 2023. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Marion County 161 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Washington

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

EKPC

Entity

PJM

Service Type

Point of Interconnection

Marion County 161 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AF1-116