Morrow County Solar II
64 MW generation in Morrow, OH · In queue since September 2019 · Proposed COD March 2026
64 MW
Capacity
1
Components
Solar
6y 8m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
6y 6m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2026-03-31
Morrow County Solar II is a proposed 64 MW solar generation project located in Morrow County, Ohio. The project is being developed within the PJM Interconnection region and is connected to the ATSI utility. It entered the PJM queue as project AF1-122 on September 17, 2019, with a proposed commercial operation date of March 31, 2026. The project's interconnection agreement has been executed, but its current status is listed as suspended.
The proposed project consists of 64 MW of solar photovoltaic generation. Morrow County Solar II has been the subject of recent news coverage related to regulatory and industry developments.
Generated from interconnection queue and public data sources
State
OH
County
Morrow
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Cardington-Liberty 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09