PJM-AF1-123
833 MW generation in City Of Chesapeake, VA · In queue since September 2019 · Proposed COD December 2025
833 MW
Capacity
1
Components
Offshore Wind
6y 8m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
6y 3m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AF1-123 is a proposed offshore wind generation project located in the City of Chesapeake, Virginia, with a total capacity of 833 MW. The project, developed by Dominion, entered the PJM interconnection queue on September 17, 2019, and has a proposed commercial operation date of December 31, 2025. The project's interconnection status is currently in the System Impact Study phase, interconnecting at the Oceana 230 kV point of interconnection.
The proposed project consists of 833 MW of offshore wind capacity. It is currently listed as an active project within the PJM queue. The project has appeared in recent news coverage regarding offshore wind development in the region.
Generated from interconnection queue and public data sources
State
VA
County
City Of Chesapeake
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Oceana 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- Oceana Substation