PJM-AF1-124
836 MW generation in City Of Chesapeake, VA · In queue since September 2019 · Proposed COD December 2026
836 MW
Capacity
1
Components
Offshore Wind
6y 8m
In Queue
System Impact Study
IA Status
COD target: 2026
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
PJM-AF1-124 is a proposed 836 MW offshore wind generation project located in the City Of Chesapeake, Virginia. The project, developed by Dominion, entered the PJM interconnection queue on September 17, 2019, with a proposed commercial operation date of December 31, 2026. Its interconnection status is currently in the System Impact Study phase.
The project consists of 836 MW of offshore wind capacity. The point of interconnection is at the Oceana 230 kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
VA
County
City Of Chesapeake
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Oceana 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- Oceana Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF1-124