Project PJM-AF1-125 — Project Summary

Queue ID
PJM-AF1-125
Capacity
820 MW
Technology
Offshore Wind
Status
active
Location
City Of Chesapeake, VA
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-125

PJM-AF1-125BetaActiveOffshore WindPJMLBNL

820 MW generation in City Of Chesapeake, VA · In queue since September 2019 · Proposed COD December 2024

820 MW

Capacity

1

Components

Offshore Wind

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2024

Interconnection

Total Duration

5y 3m

Schedule

16 months past proposed COD

Impact Study25%
Queue EntrySep 17, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

PJM-AF1-125 is a proposed 820 MW offshore wind generation project located in the City Of Chesapeake, Virginia. The project, developed by Dominion, entered the PJM interconnection queue on September 17, 2019, with a proposed commercial operation date of December 31, 2024. Its interconnection status is currently in the System Impact Study phase.

The proposed project consists of 820 MW of offshore wind capacity. The point of interconnection is at Oceana 230 kV. The project is currently listed as active in the PJM queue and has appeared in recent news coverage regarding offshore wind development in the region.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

City Of Chesapeake

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Oceana 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
POI Substation
Oceana Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.