PJM-AF1-128
569 MW generation in Chesterfield, VA · In queue since September 2019 · Proposed COD June 2023
569 MW
Capacity
1
Components
Gas
6y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 9m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-01
PJM-AF1-128 is a proposed 569 MW gas-fired generation project located in Chesterfield County, Virginia. The project is being developed within the Dominion service territory and is interconnected to the PJM Interconnection queue. The project entered the queue on September 18, 2019, with a proposed commercial operation date of June 1, 2023. Its interconnection status is currently in the System Impact Study phase.
The proposed project consists of 569 MW of gas-fired generation capacity. The point of interconnection is at the Chesterfield 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Chesterfield 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CHESTER414 KV G3
- POI Substation
- Chesterfield Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF1-128