Project PJM-AF1-128 — Project Summary

Queue ID
PJM-AF1-128
Capacity
569 MW
Technology
Gas
Status
active
Location
Chesterfield, VA
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-128

PJM-AF1-128BetaActiveGasPJMLBNL

569 MW generation in Chesterfield, VA · In queue since September 2019 · Proposed COD June 2023

569 MW

Capacity

1

Components

Gas

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2023

Interconnection

Total Duration

3y 9m

Schedule

36 months past proposed COD

Impact Study25%
Queue EntrySep 18, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-01

About

PJM-AF1-128 is a proposed 569 MW gas-fired generation project located in Chesterfield County, Virginia. The project is being developed within the Dominion service territory and is interconnected to the PJM Interconnection queue. The project entered the queue on September 18, 2019, with a proposed commercial operation date of June 1, 2023. Its interconnection status is currently in the System Impact Study phase.

The proposed project consists of 569 MW of gas-fired generation capacity. The point of interconnection is at the Chesterfield 230 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Chesterfield

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Chesterfield 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CHESTER414 KV G3
POI Substation
Chesterfield Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AF1-128