Project PJM-AF1-161 — Project Summary

Queue ID
PJM-AF1-161
Capacity
50 MW
Technology
Battery
Status
active
Location
Van Buren, MI
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-161

PJM-AF1-161BetaActiveBatteryPJMLBNL

50 MW storage in Van Buren, MI · In queue since September 2019 · Proposed COD March 2022

50 MW

Capacity

1

Components

Battery

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2022

Interconnection

Total Duration

2y 6m

Schedule

51 months past proposed COD

Impact Study25%
Queue EntrySep 20, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-03-01

About

PJM-AF1-161 is a proposed 50 MW battery storage project located in Van Buren County, Michigan. The project is in the PJM interconnection queue, having entered on September 20, 2019, with a proposed commercial operation date of March 1, 2022. The interconnecting utility is AEP. As of the latest data, the project's interconnection status is in the System Impact Study phase.

The development project consists solely of battery storage, with a total capacity of 50 MW. The point of interconnection is the Valley 138 kV substation. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

MI

County

Van Buren

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Valley 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEAV DUQ22 KV UNIT2
POI Substation
Beaver Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.