Project PJM-AF1-162 — Project Summary

Queue ID
PJM-AF1-162
Capacity
100 MW
Technology
Battery
Status
active
Location
Martin, KY
Region
PJM
Developer
IA Status
Facility Study

PJM-AF1-162

PJM-AF1-162BetaActiveBatteryPJMLBNL + Live

100 MW storage in Martin, KY · In queue since September 2019 · Proposed COD May 2028

100 MW

Capacity

1

Components

Battery

6y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

8y 8m

Facilities Study50%
Queue EntrySep 20, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-31

About

PJM-AF1-162 is a proposed 100 MW battery storage project located in Martin County, Kentucky. The project is in the PJM interconnection queue, having entered on September 20, 2019. The proposed commercial operation date is May 31, 2028. The interconnecting utility is AEP.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Inez 138 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Martin

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Inez 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
INEZ 34.5 KV MARTC2SP
POI Substation
Inez Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AF1-162