PJM-AF1-204
255 MW generation in Vermillion, IN · In queue since September 2019 · Proposed COD December 2022
255 MW
Capacity
1
Components
Wind
6y 8m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
3y 3m
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-31
PJM-AF1-204 is a proposed wind generation project with a total capacity of 255 MW, located in Vermillion County, Indiana. The project is in the PJM interconnection queue, having entered on September 25, 2019. The proposed commercial operation date is December 31, 2022.
The interconnection status for PJM-AF1-204 is currently in the System Impact Study phase. The interconnecting utility is AEP, and the point of interconnection is the Eugene 345 kV substation.
Generated from interconnection queue and public data sources
State
IN
County
Vermillion
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Eugene 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Eugene Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF1-204