Springwater Solar
155 MW generation in Madison, OH · In queue since September 2019 · Proposed COD August 2027
155 MW
Capacity
1
Components
Solar
6y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
7y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-08-31
Springwater Solar is a proposed 155 MW solar generation project located in Madison County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AF1-228, with a queue entry date of September 27, 2019. The proposed commercial operation date is August 31, 2027, and the interconnection agreement has been executed.
The project is linked to the existing Springwater Solar, LLC operating plant (EIA ID 65900). The designated point of interconnection is Beatty-Greene 345 kV. Recent news coverage has discussed the development.
Generated from interconnection queue and public data sources
State
OH
County
Madison
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Beatty-Greene 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Springwater Solar