Tymochtee Solar (PJM-AF1-229) — Project Summary

Queue ID
PJM-AF1-229
Capacity
120 MW
Technology
Solar
Status
active
Location
Wyandot, OH
Region
PJM
Developer
IA Status
IA Executed

Tymochtee Solar

PJM-AF1-229BetaActiveSolarPJMLBNL + Live

120 MW generation in Wyandot, OH · In queue since September 2019 · Proposed COD August 2027

120 MW

Capacity

1

Components

Solar

6y 8m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

7y 11m

Construction75%
Queue EntrySep 27, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-08-31

About

The Tymochtee Solar project is a proposed 120 MW solar generation facility located in Wyandot County, Ohio. The project is in the PJM interconnection queue as entry PJM-AF1-229, with a queue entry date of September 27, 2019, and a proposed commercial operation date of August 31, 2027. The interconnection agreement has been executed. The point of interconnection is the Galion-South Berwick 345 kV line.

The project is being developed within the AEP utility territory and has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Wyandot

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Galion-South Berwick 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Tymochtee Solar