AEUG Fleming Solar (PJM-AF1-233) — Project Summary

Queue ID
PJM-AF1-233
Capacity
188.5 MW
Technology
Solar
Status
active
Location
Fleming, KY
Region
PJM
Developer
IA Status
System Impact Study

AEUG Fleming Solar

PJM-AF1-233BetaActiveSolarPJMLBNL

188.5 MW generation in Fleming, KY · In queue since September 2019 · Proposed COD May 2022

188.5 MW

Capacity

1

Components

Solar

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2022

Interconnection

Total Duration

2y 8m

Schedule

48 months past proposed COD

Impact Study25%
Queue EntrySep 27, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-05-31

About

The AEUG Fleming Solar project is a proposed 188.5 MW solar generation facility located in Fleming County, Kentucky. The project, developed by AEUG Fleming Solar, LLC, is interconnected within the PJM Interconnection queue as project PJM-AF1-233. It entered the queue on September 27, 2019, with a proposed commercial operation date of May 31, 2022. The project's interconnection status is currently in the System Impact Study phase.

The proposed project is linked to the existing AEUG Fleming Solar, LLC operating plant (EIA plant ID 64658). Recent news coverage indicates regulatory interest in the project.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Fleming

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

EKPC

Entity

PJM

Service Type

Point of Interconnection

Flemingsburg _x0013_ Spurlock 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
FLMINSBG138 KV LD_4

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about AEUG Fleming Solar