AEUG Fleming Solar
188.5 MW generation in Fleming, KY · In queue since September 2019 · Proposed COD May 2022
188.5 MW
Capacity
1
Components
Solar
6y 8m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
2y 8m
Schedule
48 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-05-31
The AEUG Fleming Solar project is a proposed 188.5 MW solar generation facility located in Fleming County, Kentucky. The project, developed by AEUG Fleming Solar, LLC, is interconnected within the PJM Interconnection queue as project PJM-AF1-233. It entered the queue on September 27, 2019, with a proposed commercial operation date of May 31, 2022. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is linked to the existing AEUG Fleming Solar, LLC operating plant (EIA plant ID 64658). Recent news coverage indicates regulatory interest in the project.
Generated from interconnection queue and public data sources
State
KY
County
Fleming
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Flemingsburg _x0013_ Spurlock 138kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- FLMINSBG138 KV LD_4
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.