Project PJM-AF1-240 — Project Summary

Queue ID
PJM-AF1-240
Capacity
15.75 MW
Technology
Solar
Status
active
Location
Armstrong, PA
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-240

PJM-AF1-240BetaActiveSolarPJMLBNL

15.75 MW generation in Armstrong, PA · In queue since September 2019 · Proposed COD July 2022

15.75 MW

Capacity

1

Components

Solar

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2022

Interconnection

Total Duration

2y 10m

Schedule

47 months past proposed COD

Impact Study25%
Queue EntrySep 30, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-07-01

About

PJM-AF1-240 is a proposed solar generation project located in Armstrong County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 15.75 MW, consists entirely of solar photovoltaic generation. The queue entry date for PJM-AF1-240 is September 30, 2019, with a proposed commercial operation date of July 1, 2022. The project's interconnection status is currently in the System Impact Study phase. The interconnecting utility is PENELEC, and the point of interconnection is the Timblin 34.5 kV substation.

The development project is listed in the PJM interconnection queue. No developer is specified in the queue data. There is no indication of an existing operating plant linked to this project, nor is there mention of any recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Armstrong

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Timblin 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.