Pleasant Prairie Solar Energy Center
50 MW generation in Franklin, OH · In queue since September 2019 · Proposed COD December 2027
50 MW
Capacity
1
Components
Solar
6y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-12-31
The Pleasant Prairie Solar Energy Center is a proposed 50 MW solar generation project located in Franklin County, Ohio. The project is being developed within the PJM Interconnection queue under queue ID PJM-AF1-275. Its queue entry date is September 30, 2019, and the proposed commercial operation date is December 31, 2027. The project has an Interconnection Agreement (IA) that has been executed.
The proposed project is interconnected to the AEP utility system at the Cole 345 kV point of interconnection. The project consists of 50 MW of solar photovoltaic generation capacity. The project is currently listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
OH
County
Franklin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Cole 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- COLE 34.5 KV PLEPRASP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Pleasant Prairie Solar Energy Center