Queue ID
PJM-AF1-331
Capacity
20 MW
Technology
Solar
Status
active
Location
Ogle, IL
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF1-331

PJM-AF1-331BetaActiveSolarPJMLBNL + Live

20 MW generation in Ogle, IL · In queue since September 2019 · Proposed COD May 2028

20 MW

Capacity

1

Components

Solar

6y 8m

In Queue

System Impact Study

IA Status

COD target: 2028

Interconnection

Total Duration

8y 8m

Impact Study25%
Queue EntrySep 30, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-27

About

PJM-AF1-331 is a proposed 20 MW solar generation project located in Ogle County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 30, 2019. The proposed commercial operation date is May 27, 2028. The project's interconnection status is currently in the System Impact Study phase.

The proposed project is located within the ComEd utility territory. The project consists of 20 MW of solar photovoltaic generation.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Ogle

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Twombley Road

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.