West Lorain 138 kV Power Plant
8 MW generation in Lorain, OH · In queue since October 2019 · Proposed COD December 2028
8 MW
Capacity
1
Components
Gas
6y 7m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
9y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2028-12-31
The West Lorain 138 kV Power Plant is a proposed 8 MW gas-fired generation project located in Lorain County, Ohio. The project, under queue ID PJM-AF2-005, is in the PJM interconnection queue with an entry date of October 1, 2019. The proposed commercial operation date is December 31, 2028. The interconnecting utility is ATSI, and the project's point of interconnection is the Beaver 138 kV substation.
The project's interconnection agreement has been executed.
Generated from interconnection queue and public data sources
State
OH
County
Lorain
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Beaver 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BEAV DUQ22 KV UNIT2
- POI Substation
- Beaver Valley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.