Wild Grains Solar
150 MW generation in Van Wert, OH · In queue since October 2019 · Proposed COD December 2027
150 MW
Capacity
1
Components
Solar
6y 7m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
8y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-12-31
The Wild Grains Solar project is a proposed 150 MW solar generation project located in Van Wert County, Ohio. The project is in the PJM interconnection queue as entry PJM-AF2-014, with a queue entry date of October 18, 2019, and a proposed commercial operation date of December 31, 2027. The interconnection agreement for the project has been executed.
The proposed project, which will interconnect to the Maddox Creek 345 kV point of interconnection, is being developed within the AEP utility territory. The project has appeared in recent news coverage regarding renewable energy development in the PJM region.
Generated from interconnection queue and public data sources
State
OH
County
Van Wert
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Maddox Creek 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BLUECREE34.5 KV BLUEC1WF
- POI Substation
- Maddox Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.