Wild Grains Solar (PJM-AF2-014) — Project Summary

Queue ID
PJM-AF2-014
Capacity
150 MW
Technology
Solar
Status
active
Location
Van Wert, OH
Region
PJM
Developer
IA Status
IA Executed

Wild Grains Solar

PJM-AF2-014BetaActiveSolarPJMLBNL + Live

150 MW generation in Van Wert, OH · In queue since October 2019 · Proposed COD December 2027

150 MW

Capacity

1

Components

Solar

6y 7m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

8y 2m

Construction75%
Queue EntryOct 18, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

About

The Wild Grains Solar project is a proposed 150 MW solar generation project located in Van Wert County, Ohio. The project is in the PJM interconnection queue as entry PJM-AF2-014, with a queue entry date of October 18, 2019, and a proposed commercial operation date of December 31, 2027. The interconnection agreement for the project has been executed.

The proposed project, which will interconnect to the Maddox Creek 345 kV point of interconnection, is being developed within the AEP utility territory. The project has appeared in recent news coverage regarding renewable energy development in the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Van Wert

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Maddox Creek 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BLUECREE34.5 KV BLUEC1WF
POI Substation
Maddox Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.